Case study: the CarGo 300 AMR robot at an automotive plant
The first deployment of the CarGo 300 AMR robot: delivering parts from storage to the assembly line amid dense traffic of people and vehicles.
The task
In assembly production, parts are constantly moved from storage to the line. Usually this is done by staff with manual carts or by forklifts: short, monotonous trips repeated all shift long. The customer needed transport that drives through the plant by itself, needs no floor markings and does not get in the way of people and vehicles.
- a route of several hundred metres from storage to the assembly line;
- dense traffic: assemblers, storekeepers, forklifts, carts;
- a layout that changes during the day: totes and temporary batches of parts in the aisles;
- no rebuilding of the plant — no magnetic tape or wires in the floor.
The solution: the CarGo 300 AMR robot
CarGo 300 is an autonomous mobile robot with a payload of up to 300 kg. It drives the route once and builds a map of the plant (SLAM), while RTLS anchors give it centimetre accuracy even when the lidar is briefly “blinded” by a passing forklift. More about the navigation in “Inside CarGo 300”.
How the launch went
- Task analysis. We defined the loading points in storage and the unloading points at the line, the trip frequency and the bottlenecks along the route.
- Map and roads. The robot drove through the plant and built a map. In the RMS management system we drew roads between the points — the robot follows them and, when it meets an obstacle, drives around it and returns to the road.
- Safety. In aisles with people and before turns the robot slows down automatically, and it stops if a person suddenly appears. This runs on the two safety layers of Driver 2.0.
- Launch and training. Staff call the robot from a phone: choose the point and send. Training takes a few minutes.
Video: CarGo 300 at an automotive plant
The result
The robot handled a route of several hundred metres in dense traffic of people and vehicles — without floor markings and without rebuilding the plant. Staff no longer walk with carts between storage and the line: parts arrive on request and assemblers stay at their workstations.
How many trips one robot makes on a route of this length and how many robots a line needs is covered in “How many CarGo robots do you need: a calculation for warehouses and manufacturing”.
The role of RMS: what production sees
- Tasks come from a staff member's phone, from MES or from WMS — no dedicated operator needed.
- Monitoring: where the robot is, what it carries, its charge and route events — in one window.
- Alerts: if a trip takes longer than usual or the robot goes silent, the system raises an alert by itself.
- Reports: completed trips and operating time per shift — the basis for calculating payback.
Where else this scenario works
The same “storage → line → storage” scheme works in any manufacturing and logistics operation: feeding blanks to machines, taking finished goods to shipping, moving boxes between warehouse zones. More: “Transport robot for manufacturing” and “Transport robot for warehouses”.